Home › Cases › Lower GI Haemorrhage
Lower GI Bleed
Lower GI Haemorrhage
6 questions
Question 1 · Resuscitation
Correct answer: A-E, 2 large-bore IV cannulae, crossmatch, fluid resuscitation
Why
Haemodynamically unstable lower GI bleed: resuscitate first.
- Two large-bore cannulae
- Crossmatch 4-6 units
- IV fluids
Key point
Resuscitate before investigating. Two large-bore cannulae first.
Question 2 · Source Identification
Correct answer: CT angiography — good for active bleeding >0.5ml/min
Why
CT angiography detects active bleeding >0.5ml/min and localises source for embolisation. Colonoscopy needs bowel prep.
Key point
CT angiography first in active lower GI bleed — localises source for embolisation.
Question 3 · Transfusion
Correct answer: Transfuse below 70 g/L; aim for 70–90 g/L
Why
Transfuse if Hb <70; target 70–90 g/L. One unit (about 10 g/L rise), then recheck. Ongoing major bleed: major haemorrhage protocol.
Key point
Hb <70: transfuse to 70–90 g/L.
Question 4 · Anticoagulation
Correct answer: Reverse: IV vitamin K 5-10mg + PCC (Beriplex)
Why
Active major bleed + supratherapeutic INR = urgent warfarin reversal.
- IV vitamin K + PCC (faster than FFP)
Key point
Active major bleed on warfarin = IV vitamin K + PCC. PCC reverses within minutes.
Question 5 · Interventional Options
Correct answer: Radiological embolisation (IR)
Why
IR embolisation preferred — less invasive, comparable success, lower morbidity in elderly. Surgery reserved for IR failure.
Key point
IR embolisation preferred over emergency surgery if source identified on CT.
Question 6 · Restarting Anticoagulation
Correct answer: Restart about day 7 after bleed once haemostasis secure; agree with GI/haematology
Why
Restart anticoagulation about day 7 after bleed once haemostasis secure (BSG); earlier if high thrombotic risk, on specialist advice. Do not leave it off.
Key point
Restart ~day 7 after bleed, once haemostasis secure.
Case complete
Practice on this page does not update your app progress. Open the browser app if you want its learning tools and progress record.